ACMEPANEL
Talk to a person877-331-4266
Interior of a completed apartment at Prices Fork Village in Blacksburg Virginia

Multifamily

Apartments, workforce housing, hotels and student housing. The envelope arrives as a numbered kit and the operating cost stays low for the life of the asset.

Prices Fork Village, Blacksburg

Sixteen units. Between $1,134 and $1,323 a year back per family.

Eight three bedroom and eight two bedroom apartments behind the old Prices Fork Elementary School. Walls and roof in ACME panels. EarthCraft certified.

The residents are living at low income levels, so the energy line is not an abstraction to them. Thirteen hundred dollars a year is a car payment. For the owner it is the difference between a building that holds its residents and one that turns over every lease cycle.

If you are underwriting affordable or workforce housing, that number belongs in the operating column before you finalize rents.

Kitchen interior at Prices Fork Village Apartments
Prices Fork Village Apartments, Blacksburg, Virginia

Why developers call

Three lines on the model, not one.

Schedule

The shell closes in faster because the framing, the sheathing and the insulation arrive as one assembly with the openings already cut. Pulling dry-in forward pulls every interior trade forward with it, and construction interest is charged by the month whether or not the drywall is hung.

Labor

You need a smaller crew and a lift instead of a full framing package. In markets where framers are booked six months out, that is often the binding constraint rather than the price per square foot.

Operating cost and certification

Panel envelopes take buildings into EarthCraft, Energy Star, LEED and Passive House territory without an exotic mechanical package. If your capital stack has a green scoring component, the envelope is usually the cheapest place to earn those points.

How we work with your team

We start at schematic, not at bid.

Panel jobs go well when the panel layout informs the plan and badly when the plan is finished and handed over. Bring us in early and we will tell you where a dimension change saves a hundred cuts.

You get a 3D model, a full panel plan set and engineering stamped by someone licensed in the project state. Your GC gets numbered panels and a set schedule they can build a look-ahead around.

What we need to price it
DrawingsSchematic or better
LocationState and jurisdiction
Unit countAnd rough mix
StoriesAnd structural system below
Target dry-inMonth and year
CertificationEarthCraft, LEED, Passive House, none
TurnaroundBudget number in days, not weeks

Related work

Housing that had to hit a number.

Bring us the schematic set.

We will give you a budget number and tell you what the envelope does to your energy model and your schedule. No obligation and no sales sequence afterward.